Jump to content
  • We'd love for you to participate.

    Create an account

    Ask questions, share experiences and connect.

    Register a new account

    Sign in

    Already have an account? Sign in here.

    Sign In Now

Australia: Cruise liner operators call for Cairns shipping channel to be dredged

Rate this topic


CruiseNews

Recommended Posts

The Cairns Post newspaper says the operator of the largest cruise liner to dock at Cairns has renewed a call to dredge the shipping channel and the swing basin.

Royal Caribbean Cruises managing director Gavin Smith said while the 280m Rhapsody of the Seas was able to safely navigate Trinity Inlet at the weekend and turn in the swing basin, it was "at the limit and edge of its physical capabilities".

He said ideally the company would prefer dredging to make the task easier and safer and also to allow its larger ship, the 290m Radiance of the Seas, to dock at the cruise terminal.

However, because of its size it would have to moor off Port Douglas in February next year.

Mr Smith, who is also the chairman of International Cruise Council Australasia, acknowledged that the cost of dredging may outweigh the economic benefits of more ships docking at the Port of Cairns.

Earlier this year, Mr Smith and the Rhapsody's captain called for dredging of the channel so the ship could come into Cairns in most weather conditions

Click here to view the article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...